The York Sport Centre

The University of York is renowned for its high-quality academic programmes and excellent campus amenities, including its state-of-the-art Sport Centre. The York Sport Centre is a multi-use facility, featuring a gym, sports hall, squash courts, athletics track, and more. With a membership base of around 2,000 gym-goers, comprising of students, staff and local residents, the York Sport Centre supports a wide demographic of users, requiring modern and functional facilities.

Brief

By 2024, the changing rooms at York Sport Centre had reached over 16 years of service and were due for an upgrade. The facilities no longer aligned with the Centre’s modern aesthetic and needed to accommodate the growing number of users with varying storage requirements. The project required a significant increase in locker capacity to support the facility’s diverse range of activities, including the gym, sports hall, squash courts, and athletics track. York Sport needed a locker solution that optimised available space, provided different locker sizes to meet user needs. The refurbishment aimed to deliver a fresh, functional design while minimising disruption to facility operations.

Solution

  • Locker door finish: Egger U968 Carbon Grey
  • Lock Type: Ojmar Latch Lock for padlock use
  • Locker end panel, in-fill and upstand finish: Pfleiderer F76112 Inox Grey
  • Changing cubicles finish: Pfleiderer F76112 Inox Grey
  • Locker cantilevered Seating: Pfleiderer F76112 Inox Grey HPL with Down-Stand, Mounted on Floating Bars
  • Wall Seating: Egger U968 Carbon Grey HPL with Down-Stand Mounted on Graphite Grey Legs
  • Vanity Units: Egger U968 Carbon Grey HPL with Down-Stand
  • Free-Standing Seats: Egger U968 Carbon Grey Solent Seat
  • Shower cubicles finish: Divisions in Pfleiderer F76112 Inox Grey and doors in Pfleiderer U12231 Slate Grey
  • WC cubicles finish: Divisions in Pfleiderer F76112 Inox Grey and doors in Pfleiderer U12231 Slate Grey
  • IPS duct panels finish: Pfleiderer U12231 Slate Grey
  • Wet vanity unit finish: Top and frontage in Pfleiderer U12231 Slate Grey, access panels in Pfleiderer F76112 Inox Grey

Safe Space worked closely with York Sport and the main contractor to deliver a seamless renovation of the changing rooms. The work, completed during summer 2024, was strategically phased to keep one men’s and one women’s changing room open at all times, ensuring uninterrupted service for users.

“Safe Space were brilliant – Gregg was amazing, very responsive and excellent communication throughout the project. Nothing was ever too much trouble – Safe Space’s customer service was second-to-none and we’re really happy with the finished project. Our students have commented on how nice the new changing rooms are, as have our staff. We’ve also upgraded things like hair dryers and straighteners, so we’ve up-spec’d the overall experience, and it’s been really well received by our users.”
Kate Clough
Senior Operations Manager, York Sport